1 Eglinton Avenue E 602, Toronto, ON M4P 3A1
- Rent
- $3,257 / month
- TMI
- $4,215 / month
- Rate
- $18 / sq ft + $23.3 TMI
- Area
- 2,171 sq ft
Worked out from the rate and area the board publishes, at a twelfth of the annual figure. Confirm the terms before relying on them.
Finished office units available for lease at prime Yonge and Eglinton location. Direct access to TTC Eglinton subway station. Ample underground parking available. Building is upgrading elevators and common areas. Large building with many nearby amenities.
- MLS number
- C12070234
- Type
- Office
- Status
- Active
- Bedrooms
- —
- Bathrooms
- —
- Postal code
- M4P 3A1
- Photos
- 1
- Property tax
- $23 / year
This listing’s own days on market are shown above. How long the property has been for sale across every earlier listing is drawn from records the board releases only to registered users — a free account opens it, along with the sale history below.
Property details
As filed by the listing brokerage. Anything the board left blank is left out rather than shown as unknown — and none of it is guaranteed accurate by PropTx, so verify what you rely on.
Property
- Type
- Office
- Class
- Commercial
- Community
- Mount Pleasant West
- Municipality
- Toronto C10
- Cross street
- Yonge/Eglinton
- Zoning
- CR 5.0 (c4.0; r3.0) SS2 (x2507)
Parking
- Garage
- Underground
Land
- Lot
- 0 × 0 feet
Heating, cooling and services
- Heating
- Gas Forced Air Open
- Cooling
- Yes
- Water
- Municipal
- Sewer
- Sanitary+Storm
Listing
- MLS number
- C12070234
- Status
- Extension
- Previous status
- New
- Listed on
- 2025-04-07
- Expires
- 2026-11-21
- Possession
- 2025-06-01
- Taxes
- $23 (2026)
- Board
- Toronto Regional Real Estate Board
Listing history
No previous listings found for this address.
Where this property is
Pick a school to see the boundary it is inside. Boards redraw these — confirm with the board.
Matched to this street. The listing did not say which direction, and every candidate was in the same place.
Schools
The school boundaries this address is inside, and the schools nearest it. Boards redraw boundaries and cap programs — confirm with the board before this affects a decision.
School boundaries this address is inside
Where these boundaries come from, and what they are worth
A school boundary is the area a board draws around a school. An address inside several of them is normal — boards publish a separate boundary per program, so regular track, French immersion and specialist programs each have their own.
Toronto. Read from the TDSB’s own School Search Map, one school at a time. The board states that the lines on that map are approximate and that the schools serving an individual address must be confirmed against its own address lookup — so the outline here shows you roughly where a boundary runs, and the board answers whether a particular house is in it. The map covers home schools only: French Immersion, gifted and the other optional programs have their own boundaries and their own admission rules, and are not shown.
Homula cannot tell you which school a child will attend. Boards move boundaries, hold students at capacity, cap programs and grant exceptions, and none of that is in any published file. The board is the only authority: TDSB Find Your School.
Sources: TDSB School Search Map — the board states these lines are approximate and that individual addresses must be confirmed against its own lookup.
Other schools nearby
By distance from this address, not school boundary — a school 400 m away can be in another school’s attendance area.
| School | Level | Distance | Rating |
|---|---|---|---|
| St Monica Catholic School Toronto CDSB | Elementary | 376 m | / 10 78% met the standard |
| North Toronto Collegiate Institute Toronto DSB | Secondary | 396 m | / 10 88% met the standard · 2 of 6 measures |
| Urban International School | Elementary and secondary | 325 m | Not reported |
| UMC High School – Eglinton Campus | Secondary | 337 m | Not reported |
| UMC High School | Elementary and secondary | 337 m | Not reported |
| CareerQuest - Toronto | Secondary | 337 m | Not reported |
How the rating is calculated
EQAO — Ontario’s testing agency — publishes, for each school, the percentage of students meeting the provincial standard in Grade 3 and Grade 6 reading, writing and mathematics. The rating is the average of those percentages divided by ten. A school where 72% of students met the standard rates 7.2 out of 10.
Nothing is weighted or adjusted, and schools are not ranked against each other. Where EQAO withholds a result to protect the privacy of a small group of students, that measure is left out rather than counted as zero — so a rating built on fewer than six measures says so.
What it does not measure. It is one year of standardised testing in three subjects. It says nothing about teaching, programs, or whether a school suits a particular child, and it tracks neighbourhood household income closely enough that it partly measures the neighbourhood rather than the school. Treat it as one figure among many.
Source: Ontario Ministry of Education, School Information and Student Demographics (2024–25), Open Government Licence – Ontario.
H-Value
What an H-Value is and how it is calculated — the method and our measured error, no account needed.
This neighbourhood
Statistics Canada 2021 Census, for the surrounding few blocks — about 2,799 people.
The neighbourhood, by the census
Statistics Canada 2021 Census for dissemination area 35202671 — the few blocks around this address, home to 2,799 people. It describes the area, not this property.
Percentages are of the 2,260 responses in this category. Statistics Canada rounds counts and withholds small ones to keep individuals unidentifiable, so categories with too few people to publish are absent rather than shown as zero.
Source: Statistics Canada, 2021 Census of Population. Contains information licensed under the Open Government Licence – Canada.
What’s being built nearby
Planning applications within 500 m — 8 still in progress.
Site Plan Amendment Application in response to the additional 5-storeys approved at the North York Committee of Adjustment on June 12, 2025, approving additional height and density among other performance standards.
City planning file →OPA & Rezoning Application proposes the development of a 40-storey residential building. The building will provide a total of 524 residential units, being a mix of studio, 1-bedroom, 1-bedroom+den, 2-bedroom and 3-bedroom units.…
City planning file →The redevelopment proposes a 70-storey mixed-use building with 187.4 sq. m. of retail space at-grade and 555 residential dwelling units above, resulting in a total gross floor area (GFA) of 39,275.7 sq.…
City planning file →Site Plan Control contemplates a 5 storey Catholic Elementary School with 88 pupil place childcare and a 45 space underground parking to replace existing Catholic Elementary School.
City planning file →Site Plan approval application for a 40-storey tower with an 8-storey podium and three-levels of underground parking. The proposal incorporates residential, retail, and office uses, and will replace the existing commercial/retail spaces.…
City planning file →Combined Official Plan & Zoning By-law Amendment for a 55-storey mixed use building with a total of 664 dwelling units and 521 square metres of retail space on the first two levels.…
City planning file →Site Plan Control Application proposing a 56-storey mixed-use building containing 407 residential units, with a combined Gross Floor Area of 36,656 square-meters including 272 square-meters of commercial space at-grade.
City planning file →Combined Official Plan & Zoning By-law Amendment for a 65-storey mixed-use building with a height of 206 metres (excluding the mechanical penthouse).…
City planning file →What these are
These are applications made to the City — a proposal to build something, not a decision that it will be built. Many are refused, withdrawn, reduced, or approved and then left for years. The status shown is the one the City last recorded, and each entry links to the City’s own file, which is the authoritative record.
Whether a nearby development is welcome depends on what you want from a street, so this panel reports what has been applied for and leaves the judgement to you.
Contains information licensed under the Open Government Licence – Toronto. Toronto only for now; other municipalities publish this differently or not at all.
