4120 Yonge Street 316, Toronto, ON M2B 2B8
- Rent
- $8,710 / month
- TMI
- $8,489 / month
- Rate
- $26 / sq ft + $25.34 TMI
- Area
- 4,020 sq ft
Worked out from the rate and area the board publishes, at a twelfth of the annual figure. Confirm the terms before relying on them.
Yonge Corporate Centre is a 3-building office campus that combines modern business excellence with the tranquility of seven acres of lush greenery in Midtown Toronto. It's a destination where success and sophistication meet in the vibrant North Yonge corridor. The complex is ideally situated minutes from York Mills Subway station and a quick 3-minute drive to the Highway 401 interchange, offering exceptional connectivity for commuters.
- MLS number
- C12735870
- Type
- Office
- Status
- Active
- Bedrooms
- —
- Bathrooms
- —
- Postal code
- M2B 2B8
- Photos
- 1
- Property tax
- $25 / year
This listing’s own days on market are shown above. How long the property has been for sale across every earlier listing is drawn from records the board releases only to registered users — a free account opens it, along with the sale history below.
Property details
As filed by the listing brokerage. Anything the board left blank is left out rather than shown as unknown — and none of it is guaranteed accurate by PropTx, so verify what you rely on.
Property
- Type
- Office
- Class
- Commercial
- Community
- Bedford Park-Nortown
- Municipality
- Toronto C04
- Cross street
- Yonge/York Mills
- Zoning
- CR 1.0 (c1.0; r0.0) SS3 (x136)
Parking
- Garage
- Underground
Land
- Lot
- 0 × 0 feet
Heating, cooling and services
- Heating
- Gas Forced Air Closed
- Cooling
- Yes
- Water
- Municipal
- Sewer
- Sanitary+Storm
Listing
- MLS number
- C12735870
- Status
- New
- Previous status
- Draft
- Listed on
- 2026-01-28
- Expires
- 2027-01-27
- Taxes
- $25 (2026)
- Board
- Toronto Regional Real Estate Board
Listing history
No previous listings found for this address.
Where this property is
Pick a school to see the boundary it is inside. Boards redraw these — confirm with the board.
Matched to the building rather than the unit — every unit in a tower shares one coordinate.
Schools
The school boundaries this address is inside, and the schools nearest it. Boards redraw boundaries and cap programs — confirm with the board before this affects a decision.
School boundaries this address is inside
Where these boundaries come from, and what they are worth
A school boundary is the area a board draws around a school. An address inside several of them is normal — boards publish a separate boundary per program, so regular track, French immersion and specialist programs each have their own.
Toronto. Read from the TDSB’s own School Search Map, one school at a time. The board states that the lines on that map are approximate and that the schools serving an individual address must be confirmed against its own address lookup — so the outline here shows you roughly where a boundary runs, and the board answers whether a particular house is in it. The map covers home schools only: French Immersion, gifted and the other optional programs have their own boundaries and their own admission rules, and are not shown.
Homula cannot tell you which school a child will attend. Boards move boundaries, hold students at capacity, cap programs and grant exceptions, and none of that is in any published file. The board is the only authority: TDSB Find Your School.
Sources: TDSB School Search Map — the board states these lines are approximate and that individual addresses must be confirmed against its own lookup.
Other schools nearby
By distance from this address, not school boundary — a school 400 m away can be in another school’s attendance area.
| School | Level | Distance | Rating |
|---|---|---|---|
| Loretto Abbey Catholic Secondary School Toronto CDSB | Secondary | 688 m | / 10 77% met the standard · 2 of 6 measures |
| St Edward Catholic School Toronto CDSB | Elementary | 837 m | / 10 89% met the standard |
| Duke Academy | Secondary | 1.0 km | Not reported |
| Canada Millbrook Academy | Secondary | 1.1 km | Not reported |
| Toronto Seed Care High School | Secondary | 1.4 km | Not reported |
How the rating is calculated
EQAO — Ontario’s testing agency — publishes, for each school, the percentage of students meeting the provincial standard in Grade 3 and Grade 6 reading, writing and mathematics. The rating is the average of those percentages divided by ten. A school where 72% of students met the standard rates 7.2 out of 10.
Nothing is weighted or adjusted, and schools are not ranked against each other. Where EQAO withholds a result to protect the privacy of a small group of students, that measure is left out rather than counted as zero — so a rating built on fewer than six measures says so.
What it does not measure. It is one year of standardised testing in three subjects. It says nothing about teaching, programs, or whether a school suits a particular child, and it tracks neighbourhood household income closely enough that it partly measures the neighbourhood rather than the school. Treat it as one figure among many.
Source: Ontario Ministry of Education, School Information and Student Demographics (2024–25), Open Government Licence – Ontario.
H-Value
What an H-Value is and how it is calculated — the method and our measured error, no account needed.
This neighbourhood
Statistics Canada 2021 Census, for the surrounding few blocks — about 1,165 people.
The neighbourhood, by the census
Statistics Canada 2021 Census for dissemination area 35202398 — the few blocks around this address, home to 1,165 people. It describes the area, not this property.
Percentages are of the 695 responses in this category. Statistics Canada rounds counts and withholds small ones to keep individuals unidentifiable, so categories with too few people to publish are absent rather than shown as zero.
Source: Statistics Canada, 2021 Census of Population. Contains information licensed under the Open Government Licence – Canada.
What’s being built nearby
Planning applications within 500 m — 1 still in progress.
Site Plan Amendment related to file 20 115847 NNY 08 SA proposes to consolidate many of the previously proposed bachelor and one-bedroom units to create more functional two- and three-bedroom layouts.…
City planning file →Site Plan application to permit construction of two towers with a shared podium. OLT approved the Zoning By-Law Amendment Application for this site (20 115845 NNY 08 OZ) to permit an east building 14 storeys in height, and a west building 28 storeys in height …
City planning file →Development of two towers with a shared podium. OLT approved the Zoning By-Law Amendment Application for this site (20 115845 NNY 08 OZ) to permit an east building 14 storeys in height, and a west building 28 storeys in height ¿ Both buildings will be connecte…
City planning file →Official Plan Amendment and Zoning By Law amendment to construct a 14 storey residential building on the western portion of the subject site.…
City planning file →Development of a 7-storey office building and a 9-storey hotel component at west portion of lands. Total gross floor area of 44,670 m2 (480,824 ft2), including 24,090 m2 (259,303 ft2) for office use, 1,414 m2 (15,220 ft2) for retail and 16,276 m2 (175,194 ft2)…
City planning file →Application for a twelve-storey residential building with retail at grade. Parking would be provided in an underground garage.…
Two storey addition to the existing place of worship - Toronto Evangelistic Association
What these are
These are applications made to the City — a proposal to build something, not a decision that it will be built. Many are refused, withdrawn, reduced, or approved and then left for years. The status shown is the one the City last recorded, and each entry links to the City’s own file, which is the authoritative record.
Whether a nearby development is welcome depends on what you want from a street, so this panel reports what has been applied for and leaves the judgement to you.
Contains information licensed under the Open Government Licence – Toronto. Toronto only for now; other municipalities publish this differently or not at all.
