55 York Street 1300, Toronto, ON M5J 1R7
- Rent
- $676 / month
- TMI
- $22,185 / month
- Rate
- $1 / sq ft + $32.81 TMI
- Area
- 8,114 sq ft
Worked out from the rate and area the board publishes, at a twelfth of the annual figure. Confirm the terms before relying on them.
Steps to Union Station and surrounded by urban amenities. Beautiful heritage features preserved with modern day workplace essentials. On-site security and building operators. Secure bike storage.
- MLS number
- C12773100
- Type
- Office
- Status
- Active
- Bedrooms
- —
- Bathrooms
- —
- Postal code
- M5J 1R7
- Photos
- 5
- Property tax
- $33 / year
This listing’s own days on market are shown above. How long the property has been for sale across every earlier listing is drawn from records the board releases only to registered users — a free account opens it, along with the sale history below.
Property details
As filed by the listing brokerage. Anything the board left blank is left out rather than shown as unknown — and none of it is guaranteed accurate by PropTx, so verify what you rely on.
Property
- Type
- Office
- Class
- Commercial
- Age
- 51-99
- Community
- Bay Street Corridor
- Municipality
- Toronto C01
- Cross street
- York St and Wellington St W
- Zoning
- Commercial-Office
Land
- Lot
- 0 × 0 feet
Heating, cooling and services
- Heating
- Gas Forced Air Closed
- Cooling
- Yes
- Water
- Municipal
- Sewer
- Sanitary+Storm
Listing
- MLS number
- C12773100
- Status
- New
- Previous status
- Draft
- Listed on
- 2026-02-06
- Expires
- 2027-02-06
- Taxes
- $33 (2026)
- Board
- Toronto Regional Real Estate Board
Listing history
No previous listings found for this address.
Where this property is
Pick a school to see the boundary it is inside. Boards redraw these — confirm with the board.
Matched to the building rather than the unit — every unit in a tower shares one coordinate.
Schools
The school boundaries this address is inside, and the schools nearest it. Boards redraw boundaries and cap programs — confirm with the board before this affects a decision.
School boundaries this address is inside
Where these boundaries come from, and what they are worth
A school boundary is the area a board draws around a school. An address inside several of them is normal — boards publish a separate boundary per program, so regular track, French immersion and specialist programs each have their own.
Toronto. Read from the TDSB’s own School Search Map, one school at a time. The board states that the lines on that map are approximate and that the schools serving an individual address must be confirmed against its own address lookup — so the outline here shows you roughly where a boundary runs, and the board answers whether a particular house is in it. The map covers home schools only: French Immersion, gifted and the other optional programs have their own boundaries and their own admission rules, and are not shown.
Homula cannot tell you which school a child will attend. Boards move boundaries, hold students at capacity, cap programs and grant exceptions, and none of that is in any published file. The board is the only authority: TDSB Find Your School.
Sources: TDSB School Search Map — the board states these lines are approximate and that individual addresses must be confirmed against its own lookup.
Other schools nearby
By distance from this address, not school boundary — a school 400 m away can be in another school’s attendance area.
| School | Level | Distance | Rating |
|---|---|---|---|
| Maple Bear International School Toronto | Secondary | 136 m | Not reported |
| Concordia Ontario Academy | Secondary | 279 m | Not reported |
| Maplebridge International School | Elementary and secondary | 288 m | Not reported |
| Keystone School | Elementary and secondary | 719 m | Not reported |
| Agile Preparatory Academy | Secondary | 774 m | Not reported |
| St Michael's Choir (Sr) School Toronto CDSB | Secondary | 1.1 km | / 10 98% met the standard · 2 of 6 measures |
How the rating is calculated
EQAO — Ontario’s testing agency — publishes, for each school, the percentage of students meeting the provincial standard in Grade 3 and Grade 6 reading, writing and mathematics. The rating is the average of those percentages divided by ten. A school where 72% of students met the standard rates 7.2 out of 10.
Nothing is weighted or adjusted, and schools are not ranked against each other. Where EQAO withholds a result to protect the privacy of a small group of students, that measure is left out rather than counted as zero — so a rating built on fewer than six measures says so.
What it does not measure. It is one year of standardised testing in three subjects. It says nothing about teaching, programs, or whether a school suits a particular child, and it tracks neighbourhood household income closely enough that it partly measures the neighbourhood rather than the school. Treat it as one figure among many.
Source: Ontario Ministry of Education, School Information and Student Demographics (2024–25), Open Government Licence – Ontario.
H-Value
What an H-Value is and how it is calculated — the method and our measured error, no account needed.
This neighbourhood
Statistics Canada 2021 Census, for the surrounding few blocks — about 2,382 people.
The neighbourhood, by the census
Statistics Canada 2021 Census for dissemination area 35200855 — the few blocks around this address, home to 2,382 people. It describes the area, not this property.
Percentages are of the 1,905 responses in this category. Statistics Canada rounds counts and withholds small ones to keep individuals unidentifiable, so categories with too few people to publish are absent rather than shown as zero.
Source: Statistics Canada, 2021 Census of Population. Contains information licensed under the Open Government Licence – Canada.
What’s being built nearby
Planning applications within 500 m — 8 still in progress.
Combined Official Plan & Zoning By-law Amendment for a 2 tower mixed-use building (45 and 49 storeys) atop the historic Dominion Public Building.…
City planning file →Proposed redevelopment of the 12-storey office building at 60 Yonge Street with a 65-storey mixed-use building that includes a 5-storey base building, topped with a 61-storey residential tower, for an overall building height of 246.2 metres (including the mech…
City planning file →Combined Official Plan Amendment (OPA) & Zoning By-law Amendment (ZBA) application for a proposal to amend By-law 1015-2022, the proposed 65-storey residential tower with ground floor retail.…
City planning file →Combined Official Plan & Zoning By-law Amendment for a 68-storey residential building with at-grade retail space and 836 residential dwelling units.
City planning file →Site Plan application for a 40-storey mixed-use building that would integrate the existing designated heritage building into the base of the tower and would contain approximately 625 square metres of retail space on the ground floor and 480 rental dwelling uni…
City planning file →Official Plan and Zoning By-law Amendment application for 52-storey mixed-use building that would integrate the existing designated heritage building into the base of the tower and would contain approximately 546 square metres of retail space on the ground flo…
City planning file →Official Plan and Zoning By-law amendment application to permit converting the existing office uses in the 15-storey designated heritage building to residential uses on levels 2 to 15, infilling the southeast corner of the building and adding 6 storeys on top …
City planning file →What these are
These are applications made to the City — a proposal to build something, not a decision that it will be built. Many are refused, withdrawn, reduced, or approved and then left for years. The status shown is the one the City last recorded, and each entry links to the City’s own file, which is the authoritative record.
Whether a nearby development is welcome depends on what you want from a street, so this panel reports what has been applied for and leaves the judgement to you.
Contains information licensed under the Open Government Licence – Toronto. Toronto only for now; other municipalities publish this differently or not at all.
