261 Soudan Avenue Main, Toronto, ON M4S 1W2
Utilities includedHydro · High Speed Internet
Welcome to this Brand New Reno 3 BR, 1 Bath Main floor unit in the heart of midtown, one of Toronto's most sought-after neighborhoods. About 1000 SF. Open Concept Kitchen, Living, Dining combined. New Stainless Steel Appliances and Quarts Countertops. New floors and paint. Huge Master Bedroom with double mirrored wardrobe, fits king size bed and a desk for a home office with skylight. Two smaller, but still good size bedrooms with mirrored wardrobes as well. Stylish bath with a modern shower. Ample storage throughout. Access to a big, south-facing Backyard, and patio for your entertainment. Access to shed for even extra storage. Feels like a separate house. Some of Toronto's best schools are in the area. Fantastic location near Yonge and Eglinton with great transportation and everything you can think of like shops, restaurants, groceries at a walking distance. No Frills, Shoppers and Starbucks 2-3 minutes away. Just come and enjoy.
- MLS number
- C13725870
- Type
- Triplex
- Status
- Active
- Bedrooms
- 3
- Bathrooms
- 1
- Postal code
- M4S 1W2
- Photos
- 21
- Laundry
- In-Suite Laundry
This listing’s own days on market are shown above. How long the property has been for sale across every earlier listing is drawn from records the board releases only to registered users — a free account opens it, along with the sale history below.
Property details
As filed by the listing brokerage. Anything the board left blank is left out rather than shown as unknown — and none of it is guaranteed accurate by PropTx, so verify what you rely on.
Property
- Type
- Triplex
- Style
- 2-Storey
- Class
- Residential Freehold
- Fronting on
- North
- Community
- Mount Pleasant West
- Municipality
- Toronto C10
- Cross street
- Yonge and Eglinton
Inside
- Bedrooms
- 3
- Bedrooms above grade
- 3
- Bathrooms
- 1
- Washrooms
- 1 on the main floor
- Kitchens
- 1
- Rooms above grade
- 5
- Fireplace
- Yes
- Basement
- Finished
- Laundry
- Main Level
- Size
- 700-1100
Building
- Construction
- Brick, Aluminum Siding
- Roof
- Asphalt Shingle, Flat
- Foundation
- Concrete Block
Parking
- Covered spaces
- 0
- Driveway spaces
- 1
- Total parking
- 1
- Features
- Mutual
Land
- Lot
- 19.83 × 154 feet
- Pool
- None
Heating, cooling and services
- Heating
- Forced Air
- Heat source
- Electric
- Cooling
- Central Air
- Water
- Municipal
- Sewer
- Sewer
Features
- Interior
- None
Listing
- MLS number
- C13725870
- Status
- New
- Previous status
- Draft
- Listed on
- 2026-08-30
- Expires
- 2026-10-30
- Board
- Toronto Regional Real Estate Board
Listing history
This address has been listed 3 times.
Where this property is
Pick a school to see the boundary it is inside. Boards redraw these — confirm with the board.
Matched to the building rather than the unit — every unit in a tower shares one coordinate.
Schools
The school boundaries this address is inside, and the schools nearest it. Boards redraw boundaries and cap programs — confirm with the board before this affects a decision.
School boundaries this address is inside
Where these boundaries come from, and what they are worth
A school boundary is the area a board draws around a school. An address inside several of them is normal — boards publish a separate boundary per program, so regular track, French immersion and specialist programs each have their own.
Toronto. Read from the TDSB’s own School Search Map, one school at a time. The board states that the lines on that map are approximate and that the schools serving an individual address must be confirmed against its own address lookup — so the outline here shows you roughly where a boundary runs, and the board answers whether a particular house is in it. The map covers home schools only: French Immersion, gifted and the other optional programs have their own boundaries and their own admission rules, and are not shown.
Homula cannot tell you which school a child will attend. Boards move boundaries, hold students at capacity, cap programs and grant exceptions, and none of that is in any published file. The board is the only authority: TDSB Find Your School.
Sources: TDSB School Search Map — the board states these lines are approximate and that individual addresses must be confirmed against its own lookup.
Other schools nearby
By distance from this address, not school boundary — a school 400 m away can be in another school’s attendance area.
| School | Level | Distance | Rating |
|---|---|---|---|
| Willowdale High School | Elementary and secondary | 382 m | Not reported |
| CareerQuest - Toronto | Secondary | 390 m | Not reported |
| UMC High School – Eglinton Campus | Secondary | 395 m | Not reported |
| UMC High School | Elementary and secondary | 395 m | Not reported |
| Urban International School | Elementary and secondary | 400 m | Not reported |
H-Value
What an H-Value is and how it is calculated — the method and our measured error, no account needed.
This neighbourhood
Statistics Canada 2021 Census, for the surrounding few blocks — about 1,333 people.
The neighbourhood, by the census
Statistics Canada 2021 Census for dissemination area 35202672 — the few blocks around this address, home to 1,333 people. It describes the area, not this property.
Percentages are of the 990 responses in this category. Statistics Canada rounds counts and withholds small ones to keep individuals unidentifiable, so categories with too few people to publish are absent rather than shown as zero.
Source: Statistics Canada, 2021 Census of Population. Contains information licensed under the Open Government Licence – Canada.
What’s being built nearby
Planning applications within 500 m — 8 still in progress.
Zoning By-law Amendment application to allow for the development of a 56-storey mixed-use building comprised of a 4-storey podium and a 52-storey tower element.…
City planning file →Zoning By-law Amendment application to allow for the development of a 36-storey mixed-use building comprised of a 4-storey podium and a 32-storey tower element.…
City planning file →Zoning By-law Amendment for a 59-storey residential building with a height of 190 m (excluding the mechanical penthouse). The proposed redevelopment consists of a total gross floor area (GFA) of 48,233.4 sq.…
City planning file →Site Plan Amendment to alter the development standards for the 21-storey residential building (previously approved under 23 152381 STE 12 SA), by increasing the height and number of storeys (from 21-storeys to 26-storeys), increasing the permitted gross floor …
City planning file →OPA and Zoning By-law Amendment application proposes a mixed-use development consisting of two towers, 65 and 60 storeys in height, with residential and commercial uses at grade.…
City planning file →The redevelopment proposes a 70-storey mixed-use building with 187.4 sq. m. of retail space at-grade and 555 residential dwelling units above, resulting in a total gross floor area (GFA) of 39,275.7 sq.…
City planning file →Site Plan Control for a 56-storey residential tower that will have a total of 46,547 square metres of residential gross floor area ("GFA") and a total of 674 total dwelling units (including the 13 required rental replacement units).…
City planning file →June 2026 Revised Submission - Zoning By-law Amendment to permit a 53-storey (175.4 metres, excluding mechanical penthouse) residential building, containing 640 dwelling units (including 17 replacement rental units), and a new 173.9 square metre park, at 148-1…
City planning file →What these are
These are applications made to the City — a proposal to build something, not a decision that it will be built. Many are refused, withdrawn, reduced, or approved and then left for years. The status shown is the one the City last recorded, and each entry links to the City’s own file, which is the authoritative record.
Whether a nearby development is welcome depends on what you want from a street, so this panel reports what has been applied for and leaves the judgement to you.
Contains information licensed under the Open Government Licence – Toronto. Toronto only for now; other municipalities publish this differently or not at all.
