2286 Dufferin Street Main, Toronto, ON M6E 3S3
Utilities includedNone
The Ultimate Luxury Suite With All The Bells And Whistles... Welcome To 2286 Dufferin St. Main Floor. This Unit Is Completely Renovated Top To Bottom With Great Finishes And An Open Concept Modern Style. The Apartment Is In Super Shape Ready To Move In And Enjoy. Steps To The New LRT, Bus Stop, Shopping Great Restaurants, The Finest Entertainment And So Much More. Surrounded By Great Neighborhoods Such As Forest Hill, Via Italia, Hill Crest, And Casa Loma.
- MLS number
- W13738792
- Type
- Semi-Detached
- Status
- Active
- Bedrooms
- 1
- Bathrooms
- 1
- Postal code
- M6E 3S3
- Photos
- 9
- Laundry
- Coin Operated
This listing’s own days on market are shown above. How long the property has been for sale across every earlier listing is drawn from records the board releases only to registered users — a free account opens it, along with the sale history below.
Property details
As filed by the listing brokerage. Anything the board left blank is left out rather than shown as unknown — and none of it is guaranteed accurate by PropTx, so verify what you rely on.
Property
- Type
- Semi-Detached
- Style
- 2-Storey
- Class
- Residential Freehold
- Fronting on
- West
- Community
- Caledonia-Fairbank
- Municipality
- Toronto W03
- Cross street
- Dufferin St / Eglinton Avenue
Inside
- Bedrooms
- 1
- Bedrooms above grade
- 1
- Bathrooms
- 1
- Washrooms
- 1 on the main floor
- Kitchens
- 1
- Rooms
- 4
- Rooms above grade
- 4
- Basement
- None
- Size
- < 700
Building
- Construction
- Brick
- Roof
- Shingles
- Foundation
- Block, Concrete Block
- Attached
- Yes
Parking
- Covered spaces
- 0
- Driveway spaces
- 1
- Total parking
- 1
- Features
- Mutual
Land
- Pool
- None
Heating, cooling and services
- Heating
- Water
- Heat source
- Gas
- Cooling
- Wall Unit(s)
- Sewer
- Sewer
Features
- Interior
- None
Listing
- MLS number
- W13738792
- Status
- New
- Previous status
- Draft
- Listed on
- 2026-08-31
- Expires
- 2026-10-30
- Board
- Toronto Regional Real Estate Board
Listing history
No previous listings found for this address.
Where this property is
Pick a school to see the boundary it is inside. Boards redraw these — confirm with the board.
Matched to the building rather than the unit — every unit in a tower shares one coordinate.
Schools
The school boundaries this address is inside, and the schools nearest it. Boards redraw boundaries and cap programs — confirm with the board before this affects a decision.
School boundaries this address is inside
Where these boundaries come from, and what they are worth
A school boundary is the area a board draws around a school. An address inside several of them is normal — boards publish a separate boundary per program, so regular track, French immersion and specialist programs each have their own.
Toronto. Read from the TDSB’s own School Search Map, one school at a time. The board states that the lines on that map are approximate and that the schools serving an individual address must be confirmed against its own address lookup — so the outline here shows you roughly where a boundary runs, and the board answers whether a particular house is in it. The map covers home schools only: French Immersion, gifted and the other optional programs have their own boundaries and their own admission rules, and are not shown.
Homula cannot tell you which school a child will attend. Boards move boundaries, hold students at capacity, cap programs and grant exceptions, and none of that is in any published file. The board is the only authority: TDSB Find Your School.
Sources: TDSB School Search Map — the board states these lines are approximate and that individual addresses must be confirmed against its own lookup.
Other schools nearby
By distance from this address, not school boundary — a school 400 m away can be in another school’s attendance area.
| School | Level | Distance | Rating |
|---|---|---|---|
| Lycée Français de Toronto | Elementary and secondary | 74 m | Not reported |
| Fairbank Public School Toronto DSB | Elementary | 148 m | / 10 59% met the standard |
| St John Bosco Catholic School Toronto CDSB | Elementary | 496 m | / 10 65% met the standard |
| St Thomas Aquinas Catholic School Toronto CDSB | Elementary | 473 m | / 10 74% met the standard |
| D'Arcy McGee Catholic School Toronto CDSB | Elementary | 559 m | / 10 48% met the standard |
How the rating is calculated
EQAO — Ontario’s testing agency — publishes, for each school, the percentage of students meeting the provincial standard in Grade 3 and Grade 6 reading, writing and mathematics. The rating is the average of those percentages divided by ten. A school where 72% of students met the standard rates 7.2 out of 10.
Nothing is weighted or adjusted, and schools are not ranked against each other. Where EQAO withholds a result to protect the privacy of a small group of students, that measure is left out rather than counted as zero — so a rating built on fewer than six measures says so.
What it does not measure. It is one year of standardised testing in three subjects. It says nothing about teaching, programs, or whether a school suits a particular child, and it tracks neighbourhood household income closely enough that it partly measures the neighbourhood rather than the school. Treat it as one figure among many.
Source: Ontario Ministry of Education, School Information and Student Demographics (2024–25), Open Government Licence – Ontario.
H-Value
What an H-Value is and how it is calculated — the method and our measured error, no account needed.
This neighbourhood
Statistics Canada 2021 Census, for the surrounding few blocks — about 572 people.
The neighbourhood, by the census
Statistics Canada 2021 Census for dissemination area 35202243 — the few blocks around this address, home to 572 people. It describes the area, not this property.
Percentages are of the 295 responses in this category. Statistics Canada rounds counts and withholds small ones to keep individuals unidentifiable, so categories with too few people to publish are absent rather than shown as zero.
Source: Statistics Canada, 2021 Census of Population. Contains information licensed under the Open Government Licence – Canada.
What’s being built nearby
Planning applications within 500 m — 8 still in progress.
Combined Official Plan & Zoning By-law Amendments for a 34-storey mixed-use building (excluding mechanical penthouse) with 446 residential dwelling units.…
City planning file →Combined Official Plan and Zoning By-law Amendment for a 123.0 metre, plus mechanical penthouse (37-storey), 26,500-square metre mixed-use building, with 416 dwelling units (including 75 rental replacement units) and 500 square metres of non-residential use.…
City planning file →A combined Official Plan and Zoning By-law Amendment for a 39-storey (129.0 metre, plus mechanical penthouse), 26,800-square metre mixed use building, with 423 dwelling units (including 8 rental replacement units) and 500 square metres of non-residential use t…
City planning file →Zoning By Law Amendment Application to permit the proposal for a 35-storey mixed-use building including commercial units fronting onto Eglinton Avenue West and proposed townhouses fronting onto Livingstone Avenue.…
City planning file →Feb 2025 Submission - Site Plan resubmission for a proposed 124.73 m (39-storey excluding Mech. Penthouse) purpose built rental, mixed-use building with commercial retail at-grade, 498 residential units (including 14 rental replacement units) above, and three …
City planning file →June 2024 Proposal: a 40-storey (129.4 metres plus mech. penthouse) residential Building containing 442 dwellin units.Proposed development of a new 36-storey (116.35 metres) mixed use building with a 5-storey podium
City planning file →Site Plan Approval-15-storey residential building having a residential gross floor area of 11037.1 square metres
City planning file →Site Plan approval to facilitate the redevelopment of the site for a 24-storey mixed use building and a 9-storey apartment building.…
City planning file →What these are
These are applications made to the City — a proposal to build something, not a decision that it will be built. Many are refused, withdrawn, reduced, or approved and then left for years. The status shown is the one the City last recorded, and each entry links to the City’s own file, which is the authoritative record.
Whether a nearby development is welcome depends on what you want from a street, so this panel reports what has been applied for and leaves the judgement to you.
Contains information licensed under the Open Government Licence – Toronto. Toronto only for now; other municipalities publish this differently or not at all.
